Opens in a new tab
Septic Tank Installers
0459 333 014

Septic Tank Council Approval in Port Macquarie Hastings

Every septic system in the Port Macquarie-Hastings area needs Section 68 approval before work starts and an approval to operate afterwards. Here is how the process runs, what the application needs and what holds it up.
An installer reading site plans beside an excavation on a rural block near Port Macquarie

Installing, replacing or altering a septic system anywhere in the Port Macquarie-Hastings Council area needs approval under Section 68 of the Local Government Act before work starts, and a second approval to operate once it is in.

That applies to every property in the Port Macquarie-Hastings area, from the acreage at Thrumster and Lake Innes up the Hastings valley to Wauchope, Long Flat and Comboyne, and south through Lake Cathie and Bonny Hills to the Camden Haven at Laurieton, Kendall and Kew, whether it is a new house on acreage, a replacement for a failed tank or a granny flat going onto an existing system. This guide walks through what Port Macquarie-Hastings asks for, how the application is lodged, what happens after it is approved, and the things that most often hold an application up.

We prepare and lodge Section 68 applications with Port Macquarie-Hastings as part of every system we install. If you would rather not work through it yourself, the septic tank installation page explains how the whole job runs.

Why council approval is required

A septic tank or aerated system is a sewage management facility under the Local Government Act 1993. Section 68 of that Act lists the activities that need council approval, and installing, constructing or altering a waste treatment device is one of them. Operating a system of sewage management is another. The detail sits in the Local Government (General) Regulation and in the NSW Onsite Wastewater Management Guidelines published by the Office of Local Government, which every council in the state works from.

The reason is straightforward. A poorly designed or badly sited system contaminates groundwater, creeks and neighbouring bores, and once the effluent is in the ground there is no getting it back. Council approval is the check that the system suits the block before it is buried.

The two approvals Port Macquarie-Hastings issues

ApprovalWhenWhat it covers
Approval to install, construct or alterBefore any work startsThe system, its size and type, where it sits on the block and how the effluent will be disposed of
Approval to operateAfter installation and inspectionPermission to run the system, with conditions on servicing, pump outs and inspections

Port Macquarie-Hastings issues the approval to operate once the system has been installed and inspected. It is the document that says the system as built matches what was approved, and it carries the conditions the owner has to keep to. A property on septic that changes hands is expected to have one.

How to lodge a Section 68 application with Port Macquarie-Hastings

Port Macquarie-Hastings takes Section 68 applications electronically through the NSW Planning Portal. You register on the portal, complete the application form, attach the supporting documents and pay the fee, and council picks it up from there. Council communicates through email from that point, and the determination, plans and consents come back the same way.

Fees vary with the type of system and the circumstances of the block, and council will confirm them when the application is lodged. If the septic system is part of a development application for a new house, the Section 68 approval is usually lodged alongside it rather than separately.

What the application needs

The application is only as good as what goes in with it. Port Macquarie-Hastings will not assess an incomplete application, and the most common reason for delay is a missing document rather than a problem with the system itself. At a minimum you will need:

  • A site plan showing the house, the tank, the disposal area, boundaries, driveways, dams, creeks and any bores
  • A site and soil assessment prepared by a suitably qualified person
  • The specification and NSW Health accreditation certificate for the tank or aerated unit
  • The design of the disposal trench or irrigation area, sized from the soil assessment
  • Details of who will install the system and how it will be operated and maintained
  • The owner’s consent, signed by every owner of the land

The site and soil assessment is the document that does the heavy lifting. It records the soil type, how quickly it drains, how deep the water table sits, the slope of the block and the setbacks to boundaries, buildings, dams and watercourses. From that the assessor sets the size of the disposal area and, in some cases, decides that a conventional trench will not work and an aerated wastewater treatment system is needed instead.

Inspections and the approval to operate

Council inspects the system before it is backfilled, so the tank, the drainage and the disposal area can be seen as they were built. The installer books that inspection, and nothing gets covered until it has been done. Once council is satisfied the work matches the approved design, the approval to operate is issued.

The approval to operate carries conditions. For a conventional septic tank that usually means pumping the tank out on a regular cycle and keeping the disposal area clear of traffic, structures and deep rooted plants. For an aerated system it means a quarterly service by an accredited technician, which is a NSW Health requirement, and the service contract has to be in place before the approval is issued.

Sensitive areas around Port Macquarie

The Hastings, the Camden Haven and the coastal lakes at Lake Cathie and Lake Innes are all areas where council looks closely at setbacks to water. Blocks with a high water table, sandy soil near the coast or a creek along a boundary will often need a higher treatment standard than a conventional trench can deliver, which means an aerated system with irrigation. The site and soil assessment is where that is decided, and it is worth having it done before a tank is bought.

On the higher, better drained ground up the valley toward Wauchope and Comboyne a conventional concrete or poly tank with a trench is usually fine. Our Wauchope and Laurieton pages cover what we typically see in each part of the area.

What holds applications up

  • A tank that is not NSW Health accredited, or that is undersized for the number of bedrooms under the state guidelines
  • No site and soil assessment, or one that does not address the setbacks council needs to see
  • A disposal area drawn where it cannot go, over a boundary setback, a dam buffer or a flood line
  • A room with a door and a window that council counts as a bedroom, which pushes the house up a size band
  • Missing owner consent, or an application lodged by a builder without the owner signing it

Most of these are avoidable if the application is prepared by someone who has lodged with Port Macquarie-Hastings before. It is the part of the job we do for every system, and it is usually the difference between an approval in weeks and one that drags on.

Frequently asked questions

Do I need council approval for a septic tank in Port Macquarie?

Yes. Installing, replacing or altering any septic system in the Port Macquarie-Hastings area needs approval under Section 68 of the Local Government Act before work starts, followed by an approval to operate once it is installed and inspected.

How do I apply for septic approval with Port Macquarie-Hastings Council?

Through the NSW Planning Portal. You register, complete the Section 68 application, attach the site plan, soil assessment, tank accreditation and owner consent, and pay the fee. Council then assesses it and communicates by email.

How long does septic approval take in Port Macquarie-Hastings?

It depends on how complete the application is and how busy council is. A complete application with a good soil assessment is usually the quickest. Missing documents are the most common cause of delay.

Does a replacement septic tank need approval?

Yes. Replacing a tank or rebuilding a disposal trench is an alteration to the system and needs Section 68 approval, even if the new tank goes in the same hole.

Can my installer lodge the application for me?

Yes. We prepare and lodge Section 68 applications with Port Macquarie-Hastings as part of every system we install. The owner still has to sign the consent.

Getting it approved

Start with the site and soil assessment, because everything else follows from it. Then make sure the tank is accredited and sized to the bedrooms, the disposal area sits where the setbacks allow, and the owner has signed. Lodge with Port Macquarie-Hastings, wait for the approval to install, build it to the approved design, and book the inspection so the approval to operate can be issued.

We do all of that as part of installing a system, across the Port Macquarie-Hastings Council area and the rest of the Mid North Coast. If you have a block and a plan, get in touch and we will tell you what the approval will need. For the council’s own information, see Port Macquarie-Hastings Council.

Let’s Get Your Septic System Sorted

Contact Us

Whether you’re ready to book or just have a few questions, we’re here to help. Reach out today and we’ll guide you through the next steps.

  • Phone

    0459 333 014
  • Location

    Mid North Coast & Manning Valley
  • Hours

    7.00am to 5.00pm - Every Day
BioCycle Septic System Accredited Installer
Biocycle Accredited Installer